Home Entertainment Gurugram News: Power system to be repaired soon in Ward 33: Mangatram...

Gurugram News: Power system to be repaired soon in Ward 33: Mangatram Bagri

6
0
Gurugram News: Power system to be repaired soon in Ward 33: Mangatram Bagri



Senior BJP leader and former councilor Mangat Ram Bagri submits a memorandum to the executive engineer of DHBVN on Ward 33’s electricity issues.

  • Electrical officials inspected the scene.

(Gurugram News) Gurugram. Thanks to the efforts of senior BJP leader and former councilor Mangat Ram Bagri, the process of upgrading the power system in Ward 10 (recently declared Ward 33) has been accelerated. Immediate action was taken when Mangat Ram Bagri handed over the demand letter to the superintending engineer of South Haryana Electricity Distribution Corporation, Gurugram. Within an hour, power company officials inspected the damaged cables, poles and transformers.

Because the transformers are very low and the cables are damaged, there is always the possibility of an accident.

Mangat Ram Bagri handed over the demand letter to the superintending engineer and informed that the electric cables, transformers and poles in areas like Laxman Vihar etc. under ward 33 of the Municipal Corporation are in ruins for a long time. Because the transformers are very low and the cables are damaged, there is always the possibility of an accident. Even in light rain or wind, a failure occurs and the electricity remains out for hours.

Low-capacity transformers were installed in the room a long time ago, which are currently not capable of withstanding the electrical load. Due to the increase in population, the demand and load of electricity has increased. Therefore, it is necessary to install more capacity transformers. All deteriorated cables, poles and transformers must be replaced and insulators replaced and poles and transformers must be wired for safety reasons.

New poles, cables and transformers should be installed at necessary places so that the public can get uninterrupted electricity as intended by the government. Mangat Ram Bagri said the superintending engineer took this demand seriously and ordered XEN over phone to do the work with immediate effect.

Also Read: Gurugram News: New collection rates to come into effect from December 1: Ajay Kumar






Previous articleIt’s the right time to buy the iPhone 16, save big like this


LEAVE A REPLY

Please enter your comment!
Please enter your name here